DOWNLOAD COMPLETE FOR SPARE PARTS CATALOG MANUAL CHALLENGER TERRAGATOR TWIN BIN C SYSTEM 604344D1 - PDF FILE
ENHANCE YOUR MAINTENANCE AND REPAIR CAPABILITIES WITH THE CHALLENGER TERRAGATOR TWIN BIN C SYSTEM SPARE PARTS CATALOGUE MANUAL 604344D1. THIS COMPREHENSIVE PDF FILE SERVES AS AN ESSENTIAL RESOURCE FOR IDENTIFYING AND SOURCING THE RIGHT SPARE PARTS FOR YOUR EQUIPMENT, ENSURING OPTIMAL PERFORMANCE AND LONGEVITY. WITH DETAILED DIAGRAMS AND PART NUMBERS, YOU CAN EASILY NAVIGATE THROUGH THE COMPONENTS, SAVING TIME AND REDUCING DOWNTIME. INVEST IN THIS MANUAL TODAY TO KEEP YOUR MACHINERY RUNNING SMOOTHLY AND EFFICIENTLY.
PART NUMBER :
604344D1
SERIAL NUMBER:
KXXX1001-..MXXX9999
MODEL COVERED :
CHALLENGER TWIN BIN TERRAGATOR ‘C’ SYSTEM (2019-2021)
CONTENT MANUAL
PRODUCT CONTAINMENT
TWIN BIN 4 BIN
BOX ASSEMBLY, TWIN BIN
CAGE ASSEMBLY
CONVEYOR ASSEMBLY
COVER ASSEMBLY, REAR BULKHEAD
LEFT HAND
RIGHT HAND
V-HOOD ASSEMBLY
LADDER TO DISTRIBUTOR
LADDER LOWER, REAR
LIFT EYE INSTALLATION , SOILECTION
LUBE SYSTEM INSTALLATION, TWIN BIN
METERING MECHANISM INSTALLATION, CHAIN, TWIN BIN
METERING CHAIN INSTALLATION
MUD GUARD ASSEMBLY
RISER INSTALLATION, 4.00 INCH, WITH GRANULAR, TWIN BIN
RISER INSTALLATION, 4.00 INCH, WITHOUT GRANULAR, TWIN BIN
RISER INSTALLATION, 8.00 INCH, WITH GRANULAR, TWIN BIN
BOLT INSTALLATION-DUMMY, TWIN BIN, 8.00
RISER INSTALLATION, 8.00 INCH, WITHOUT GRANULAR, TWIN BIN
SLEEPER INSTALLATION
AUXILIARY
PRIMARY PRODUCT DISTRIBUTION
AUGER ASSEMBLY, TWIN BIN AND 4 BIN
DISTRIBUTOR AND AUGER ASSEMBLY, TWIN BIN 4 BIN
AUGER MOTOR ASSEMBLY, HORIZONTAL
AUGER MOTOR ASSEMBLY, VERTICAL
DROP HOSE ASSEMBLY, AIR SPREADER
AIR SPREADER
DRAIN VALVE ASSEMBLY
BALL VALVE, 1.50 INCH POLY, FULL FLOW
DROP CHUTE INSTALLATION, TWIN BIN
RAIN TARP INSTALLATION, REAR OF BOX
GRANULAR BIN INSTALLATION, 8 INCH
BOOMS
MANIFOLD AND VENTURI ASSEMBLY
BUTTERFLY VALVE ASSEMBLY LH
AIR CYLINDER ASSEMBLY, LEFT HAND
BUTTERFLY VALVE ASSEMBLY RH
BUTTERFLY VALVE ASSEMBLY LH CENTER
AIR CYLINDER ASSEMBLY, LEFT HAND, CENTER
BUTTERFLY VALVE ASSEMBLY RH CENTER
AIR CYLINDER ASSEMBLY, RIGHT HAND, CENTER
BOOM CENTER SECTION INSTALLATION
FAN AND BOOM SHUT-OFF INSTALLATION
FAN ASSEMBLY, METRIC, LEFT HAND
FAN MOTOR ASSEMBLY
HYDRAULIC MOTOR, 6.0 CIR DISPLACEMENT
FAN ASSEMBLY, METRIC, RIGHT HAND
OIL COOLER ASSEMBLY, LEFT HAND
OIL COOLER ASSEMBLY, RIGHT HAND
VENTURI TUBE LOCATOR LOCK ASSEMBLY
HYDRAULIC CYLINDER ASSEMBLY, BOOM MOTION, AIR SPREADER
BOOM CRADLE INSTALLATION, AIR SPREADER
CRADLE ASSEMBLY, AIR SPREADER
NOZZLE CLAMP AND BAND ASSEMBLY, COMMON, STANDARD
NOZZLE INSTALLATION
SLIDER AND STOP ASSEMBLY, CENTER BOOM
FOAM MARKER
FRONT MOUNT
FOAM MARKER ASSEMBLY, TANK AND PUMPS
BALL VALVE, 0.75 NPT, UNION, POLY
PLUMBING INSTALLATION
FOAM MARKER MIXING CHAMBER, RICHWAY
NO FOAM MARKER
HYDRAULIC SYSTEM
HYDRAULIC HOSE INSTALLATION, TWIN BIN
HYDRAULIC ROUTING ACCESSORIES
HYDRAULIC COMPONENT INSTALLATION
BULKHEAD ASSEMBLY, FAN MOTOR
FAN SPEED SERVO VALVE INSTALLATION
FAN SPEED SERVO VALVE ASSEMBLY
GAUGE INSTALLATION, FAN AUGER
HIGH PRESSURE FILTER ASSEMBLY
HYDRAULIC FILTER ASSEMBLY, TWIN BIN AND 4 BIN
HYDRAULIC PLUMBING ASSEMBLY, VALVE
HYDRAULIC PUMP TEE INSTALLATION
HYDRAULIC TANK ASSEMBLY
HYDRAULIC TANK MOUNT
HYDRAULIC VALVE ASSEMBLY, AUGER CONTROL
HYDRAULIC VALVE ASSEMBLY, CONVEYOR SPEED
HYDRAULIC VALVE ASSEMBLY, FLOW CONTROL
HYDRAULIC VALVE INSTALLATION, TWIN BIN BOOM BLOCK
TG8300 TG8400
TG9300
HYDRAULIC MOTOR ASSEMBLY, METERING, MECHANICAL
HYDRAULIC MOTOR, 26 CID
OIL TANK HEATER INSTALLATION, 110 VOLT
PISTON PUMP, 60 CC, RIGHT HAND
PISTON PUMP, 90CC, RIGHT HAND
ELECTRICAL SYSTEM
TWIN BIN
ELECTRICAL INSTALLATION, CONTROL BOX
COMMON ELECTRICAL BOX ASSEMBLY
BRACKET ASSEMBLY
AIR SPREADER, TERRAGATOR
NO BEACON OPTION
TGC
GRANULAR, POWER DISTRIBUTION BOX ASSEMBLY
ELECTRICAL BOX ASSEMBLY
GRANULAR, POWER HARNESS INSTALLATION, AIR SPREADER
REWORK ELECTRICAL ASSEMBLY PICKUP
SPEED REDUCER
MOTOR ELECTRICAL 12 VOLT DC
HARNESS INSTALLATION
AMBER WARNING FLASHING LIGHT INSTALLATION
WORKLIGHT INSTALLATION, HALOGEN
WORKLIGHT INSTALLATION, HID
WORKLIGHT INSTALLATION, LED
CONTROLLER SYSTEM
RAVEN
AIR SYSTEM
AIR VALVE BOX ASSEMBLY
GRANULAR
MANIFOLD ASSEMBLY
AIRLINE INSTALLATION, AIR SPREADER
PRESSURE WASHER AND RINSE SYSTEM
50 GALLON
TANK ASSEMBLY
PLUMBING ASSEMBLY
PUMP REWORK, MOTOR, H R
PUMP AND MOTOR, DU105 HYPRO
PUMP 4101N, H, DU105
CAP TUBE INSTALLATION, NO PRESSURE WASHER
SPLASH GUARD ASSEMBLY, LEFT HAND, FRONT
SPLASH GUARD ASSEMBLY, RIGHT HAND, FRONT
ASSEMBLY
SPLASH GUARD ASSEMBLY, LEFT HAND, REAR
SPLASH GUARD ASSEMBLY, RIGHT HAND, REAR
DECALS
DECAL INSTALLATION, BOX
DECAL INSTALLATION, TWIN BIN
DECAL INSTALLATION, REFLECTIVE, DOT
EDGE LINER AND TREAD INSTALLATION
LIFT EYE DECAL INSTALLATION , 2 BIN 4 BIN
ATTACHMENTS
ROLL TARP, ELECTRICAL, WITH GRANULAR
RATCHET ASSEMBLY, 1.00 INCH, SS
ROLL TARP, ELECTRICAL, WITHOUT GRANULAR
DRY SYSTEM
3 WHEEL
ACCESSORIES
FIELD ACCESSORIES, FOAM MARKER, 50 GALLON
PLUMBING KIT
SIZE : 35.41 MB
TOTAL PAGES : 663
FORMAT : PDF
LANGUAGE : ENGLISH
DOWNLOAD INFORMATION - YOU WILL RECEIVE THE DOWNLOAD LINK ON YOUR GIVEN E-MAIL.